
As a decorative panel, the use of its products can be seen in many buildings, which increases its decorativeness, aesthetics, and thermal insulation. But in order to give full play to its various performances, its related installation and operation points are very important.
1. Basic processing
(1) Remove floating ash, steelhead, oil, hollowing, and weathering that affect the flatness of the BFT wall panels installation.
(2) For the exterior wall of this project, the upper limit error should be less than 4mm×2m, and the over-tolerance part should be chiseled or repaired with 1:3 cement mortar.
2. Built-in parts and bearings
(1) According to the measurement reference line, determine the position of the embedded parts of the BFT wall panels.
(2) The anchor reinforcement of the embedded parts should be reliably connected with the main reinforcement, and the exposed surface should be smooth and accurate.
(3) The pull-out force test must be carried out for the rear embedded parts.
(4) Embedded parts and bearings are connected by bolts, which must meet the requirements of various mechanical performance tests and other tests.
To sum up, the basic treatment and embedded parts and support of BFT wall panels are the focus of this operation, so special attention must be paid to these two operations during the installation process to ensure the intact use of the panels.




