Decorative insulated wall panels can not only play a role in heat preservation and energy saving but also beautify and decorate so that decorative insulated wall panels can serve us for a long time, so we should take some waterproof measures for external wall insulation materials. Next, we will pick some waterproof design methods, I hope we can help you.

1. Asphalt waterproofing membrane during use: use base paper, fibers, and fabrics to coat asphalt. It can be made into professional waterproof construction materials.
2. One waterproof maintenance: professional waterproof equipment.
3. Asphalt for waterproofing construction roll: base paper, fiber, fabric, fiber felt, and other carcass materials are used to dip-coat asphalt, and the surface is sprinkled with powdery, granular, or sheet-like structural materials to make bendable sheet-like or waterproof engineering materials.
4. Polymer-modified asphalt waterproofing membrane: The synthetic polymer-modified asphalt is used as the coating, the fiber fabric or fiber mat is used as the substrate, and the sheet or film material is used as the coating material to make a flexible sheet waterproof material.
5. Composition research Polymer waterproof membrane: it is made of synthetic rubber, synthetic resin, or their blend through the two as the base material, adding the appropriate amount of chemical additives and fillers, etc., and processed through different production processes. Flexible sheet-like waterproof engineering materials, or composite development of the above-mentioned analytical materials and synthetic fibers to form flexible sheet-like waterproof building materials with two or more layers.
6. Floor glue is cold asphalt cement made of petroleum asphalt, fillers, solvents, etc.
7. Bottom surface treatment agent: To enhance the adhesion, the paint on the bottom layer is pre-painted before the construction of the waterproof layer.
8. Slits: To reduce cracks, pre-set seams on the roof leveling layer, rigid waterproof layer, and rigid maintenance layer. The rigid protection layer is made into a V-shaped groove on the surface, which is called a surface for divisions.
9. Full sticking method (full sticking method): When laying waterproof materials, the construction method of full sticking between the coiled material and the bottom layer is adopted.
10. Empty laying method: When laying waterproof membranes, the membranes and the bottom layer are only bonded for a certain period around the surroundings, and the other two parts are not bonded.
11. Strip bonding method: When laying waterproof membranes, the construction method of strip bonding is used for the membrane and the bottom layer. There are no less than two bonding surfaces between each coil and the bottom layer, and the width of each data is generally not less than 150mm.
12. Dot sticking method: When laying a waterproof membrane, the membrane or perforated membrane should be dotted on the bottom layer. The bonding area between each square meter is not less than 5 points, and the area of each point is 100mm×100mm.
13. Hot-melt method: The traditional flame heater can be used to melt the hot-melt waterproof membrane as the bottom hot-sol for an effective bonding construction management method.